Key Eqp Report for Semiconductor Essay

Submitted By jackiefanre
Words: 698
Pages: 3

EQP&WIP Report

2013/5/31

1

EQP&WIP Report Introduce
 Purpose
Purpose EQP Status Comments Query every equipment current state and history status

Moves
WIP Available Capability Production Scheduling

Query Equipments/Group hourly output
Query Group hourly WIP status Query the ratio of available time Query the capability, and compare it with STD capability Make the production scheduling by arrivetime, Lots kinds

 Benefits
Item Improve work efficiency Comments

The Engineers may used about one hour to make the EQP Status Chart, use the system just cost 1Second,and they could use it anytime when they need The WIP&State Chart exposed the problems, eg: equipment is idle when WIP's queue ,Output is low, PM time too long and so on.

EQP Available time increase

Shorten The Production Cycle Time Production C/T shorten 30% averagely
2013/5/31 2

EQP&WIP Report Introduce
 EQP status query

Select query style

Select GROUPID or EQPID which you want to query

Select date which you want to query.8 o’clock to next day 8 o’clock is one day, the same as our work hour system.

 Click “Query” after select GroupID/EQPID and Date
2013/5/31 3

 EQP status query

EQP&WIP Report Introduce

Select date which you want to query.8 o’clock to next day 8 o’clock is one day, the same as our work hour system.

Select query style

Select GROUPID or EQPID which you want to query

 Click “Query” after select GroupID/EQPID and Date
2013/5/31 4

 EQP status and WIP query

EQP&WIP Report Introduce

Current:Eight a.m. to now output Move and Move Time Forecast:Theoretical capacity of machine group by tomorrow morning, at 8 o 'clock Capability:Theoretical capacity of machine group by one day P:The machine group of 8 o 'clock yesterday morning WIP WIP WIP:Now the machine group of WIP Run、Queue、Wait、Hold:Now four status of WIP Total:The number of machines Run、Lost、Down、Other:The number of different status machines Current:Reality WPH 8 a.m. to now :machine group output/machine output STD:Standard WPH Available Time:Run and Lost and Test status time Current:Eight a.m. to now Available Time/24/The number of machines Available STD:Standard Available Time/From this month number 1 to now/From this month number 1 to now/days MTD:From this month number 1 to now Run、Lost、TEST:The status proportion 8 a.m. to now

EQP WPH

 History records inquires the: inquires the history, present data for that date, the end point (that is, the second day morning at eight) backup data.
2013/5/31 5

EQP&WIP Report Introduce
 EQP status query result,