(b) Calculate the overhead applied.
(c) Determine the amount of overhead that is over/underapplied. | | | Student Answer: | | a) Calculate the predetermined overhead rate. 2250000/415000 = 5.4217 per hour (b) Calculate the overhead applied. 422000 x 5.4217 = 2287952 (c) Determine the amount of overhead that is over/under applied. 2287952-2200000 = 87952 over …show more content…
| Question : | (TCO 2) Match each of the following six terms with the phrase that most closely describes it. Each answer below may be used only once. ______ 1. activity-based costing
______ 2. cost of goods available for sale
______ 3. period costs
______ 4. process costing system
______ 5. just-in-time system
______ 6. work in process (A) Costs assigned to the goods produced; also known as manufacturing costs
(B) Materials costs that are not traced directly to products produced
(C) System that seeks to minimize Raw Materials Inventory and Work in Process Inventory
(D) Cost of items that are completed and transferred from Work in Process Inventory to Finished Goods Inventory
(E) Costs that are identified with accounting periods rather than with goods produced
(F) Actual overhead is greater than overhead that has been applied