CE 1.1
This career episode showcases the work I did from 14th August 2011 to 15th October 2014 and summarizes the experience and knowledge gained during my tenure.
Chronology : 14th August 2011 to 15th October 2014
Name of the organization : Scott Biotech Private Ltd
Geographic location : Delhi, India
Project Title : Installation, testing and programming of serial communication panels, variable frequency drive, car operation panels, landing operation panels in passenger elevator.
Position Held : Senior Electronics Engineer
Background
CE 1.2
My nature of work was to lead …show more content…
The project installation required great precision and due diligence. The budget constraints necessitated that we begin with a feasibility study, usage and load calculations. I used a 16-bit processor instead of a 32-bit processor with the cost constraints in mind. While designing and assembling the components I made sure that the main board is compatible with all types of encoders because, during my engineering studies, I learned the importance of universal compatibility and synchronization. I used PC or console for programming and varying the parameters to align the performance of the elevator as per end user demands like setting ideal door speed, door closing and opening times. In the designing and testing of the cop and lops, I tested different types of displays like seven segment display, dot matrix display, programmable LCD displays under different temperatures and climatic conditions. I also tested Push button and touch screen sensor push buttons under different climatic